A concrete bottom plate has been prepared and made for the time being. It will be used as a base for the installation of the boiler – a steel, water-heating and heating boiler burning biomass, with a nominal power of 100 kW.

Aluminum radiators are being installed in the new school building, using horizontal and vertical pipes consisting of galvanized steel press-fitted pipes. In order to save energy, thermostatic valves with a thermal head will be installed on each radiator. Automated air eliminators will be fitted on all vertical ascending pipes and critical points.

In the old school building aluminum radiators have been installed without using horizontal and vertical pipes consisting of galvanized steel press-fitted pipes.